Question 3
« on: April 20, 2009, 02:37:22 PM »
QUESTION 3
The drawing opposite shows a plan of a group of three shops and a restaurant.
The car parking area at the rear of the buildings has a sealed surface.
There is a paved public walk way from the parking area to the front of the buildings.
Foul water drainage is to connect to the appropriate sewer connection. All components of the foul
water system are to be external to the building.
Surface water from the car park area and storm water drainage are to combine and discharge at
the storm water sewer connection.
Drainage systems are to comply with AS/NZS 3500 Part 2: Sanitary plumbing and drainage.
On the plan, draw and label the drainage systems. Include foul water and storm water systems,
all pipe work, bends, junctions, fittings, traps, inspections, chambers and ventilation points.

PLEASE SEE PDF FOR IMAGE

Total 15 marks
 

Linkback: https://www.plumbers.nz/drainlaying-exam-june-2008/27/question-3/224/


Share via digg Share via facebook Share via linkedin Share via twitter

Similar Topics

  Subject / Started by Replies / Views Last post
xx
Question 15

Started by LisaS

0 Replies
2212 Views
Last post February 11, 2009, 08:59:20 AM
by LisaS
xx
Question 14

Started by LisaS

0 Replies
1876 Views
Last post February 11, 2009, 08:59:42 AM
by LisaS
xx
Question 13

Started by LisaS

0 Replies
1938 Views
Last post February 11, 2009, 09:00:14 AM
by LisaS
xx
Question 12

Started by LisaS

0 Replies
2002 Views
Last post February 11, 2009, 09:01:09 AM
by LisaS
 
Share this topic...
In a forum
(BBCode)
In a site/blog
(HTML)