QUESTION 4
The diagram opposite shows an as-built plan of a foul water drainage system. 
The drainage system complies with AS/NZS 3500 Part 2: Sanitary plumbing and drainage. 
The scale used is 1 to 200.
(a)  In the table below, compile a list of all pipe work, bends, inspections, junctions and gullies 
to meet the minimum requirements of AS/NZS 3500 Part 2: Sanitary plumbing and drainage.
Do not include inspections or fittings at the sewer connection.
(b)  Using the costs per item given, calculate the total cost of materials.

PLEASE SEE PDF FOR TABLE

Total 9 marks

PLEASE SEE PDF FOR IMAGE

Linkback: https://www.plumbers.nz/drainlaying-exam-june-2008/27/question-4/223/


Share via digg Share via facebook Share via linkedin Share via twitter

Similar Topics

  Subject / Started by Replies / Views Last post
xx
Question 15

Started by LisaS

0 Replies
2212 Views
Last post February 11, 2009, 08:59:20 AM
by LisaS
xx
Question 14

Started by LisaS

0 Replies
1876 Views
Last post February 11, 2009, 08:59:42 AM
by LisaS
xx
Question 13

Started by LisaS

0 Replies
1938 Views
Last post February 11, 2009, 09:00:14 AM
by LisaS
xx
Question 12

Started by LisaS

0 Replies
2002 Views
Last post February 11, 2009, 09:01:09 AM
by LisaS
 
Share this topic...
In a forum
(BBCode)
In a site/blog
(HTML)